Run the day
The whole trading day, on one screen.
From the 6:30am brief to the 5:30pm drawer count, Opsider follows the day you already run.
- Built in Australia
- GST and BAS ready
- Your data exports any day
-
The Morning Brief is waiting
14 decisions sorted overnight, and every line ends in a button.
-
The pick list announces every swap
Trout becomes salmon, and Brinecourt is emailed before the van leaves.
-
The bench gets one number per product
Brisket is 62 kg across 9 orders: one line, one job.
-
The scale does the typing
Ordered 5.00 kg, packed 4.82 kg, and the invoice says 4.82 kg.
-
The vans leave in map order
Suburbs put each stop on the right van before anyone touches the board.
-
The dock receives against the PO
Every intake becomes a lot as it crosses the dock.
-
The drawer meets the Z-report
Counted against expected to the cent, and the Z-report prints at 5:31pm.
01 / The board
All day
Six plain stages. Honest counts.
New, Picking, Cut, Packed, Loaded, Delivered: tick a run's worth and move them together.
02 / The vans
9:05am
Load the vans the way the map likes.
The office drags orders onto runs, and the driver logs proof at the door.
The office: drag any stop to overrule the map
The driver: probe, photo and signature
03 / Around the day
Where the day starts, and where it lands.
Walk a whole day, brief to close.
Twenty minutes, on examples like yours, no obligation. Tell us when your vans leave.